Tractor Auger
Up to 3 m depthMechanised auger drilling rigs — the backbone of our pile foundation capacity.
JCB (Backhoe Loader)
3DX classExcavation, trenching, grading and material handling across site.
Tractor with Assets
45–55 HPHaulage, towing and site logistics with trolley and levelling attachments.
Ajex Transit Mixer
Self-loadingSelf-loading concrete mixers for pile and foundation concreting at remote blocks.
Hydra Crane
14–16 TPick-and-carry cranes for MMS and structural erection.
Farana Crane
MobileMobile cranes for lifting inverter, transformer and steel assemblies.
JCB & Tractor Forklift
2–3 TModule pallet handling and unloading without damage.
Truck – Trailer
Long bodyTransport of MMS steel, modules and construction material to site.
Pick-up
1–1.5 TCrew movement, tool transport and daily site logistics.
Power Tool Sets
Torque-controlledTorque wrenches, drills, grinders and crimping tools for module and electrical work.
Machines and crew, both on our books
160+ skilled and semi-skilled workers, 4 site supervisors, 2 civil engineers and 1 electrical engineer — over 180 in all.
കൂടുതൽ അറിയുകSkilled workers
Site supervisors
Civil engineers
Electrical engineer
Have a solar project? Let's talk.
Send the capacity, the location and the timeline. A complete tender enquiry is normally answered within one working day.