Module installation is a volume game that cannot compromise on care. Our crews handle unloading, storage, structure erection, module mounting, torque-controlled fastening and earthing continuity — with breakage tracked per lot.
GCC has erected PV modules and fixed-tilt MMS for the 296 MW NTPC Solar Power Project at Fatehgarh, and modules with tracker MMS for the 300 MW Cluster 2B project at Keraliya.
আমরা কীভাবে করি
Unloading & Storage
Module unloading with forklifts, damage inspection and lot-wise stacking.
Structure Erection
MMS purlins and rafters erected and aligned to tolerance.
Module Mounting
Torque-controlled clamping, earthing continuity, breakage log per lot.
Cleaning & Handover
Row cleaning, punch-list closure and joint measurement sheet.