Module installation is a volume game that cannot compromise on care. Our crews handle unloading, storage, structure erection, module mounting, torque-controlled fastening and earthing continuity — with breakage tracked per lot.
GCC has erected PV modules and fixed-tilt MMS for the 296 MW NTPC Solar Power Project at Fatehgarh, and modules with tracker MMS for the 300 MW Cluster 2B project at Keraliya.
ਅਸੀਂ ਇਹ ਕਿਵੇਂ ਕਰਦੇ ਹਾਂ
Unloading & Storage
Module unloading with forklifts, damage inspection and lot-wise stacking.
Structure Erection
MMS purlins and rafters erected and aligned to tolerance.
Module Mounting
Torque-controlled clamping, earthing continuity, breakage log per lot.
Cleaning & Handover
Row cleaning, punch-list closure and joint measurement sheet.