Solar Module Installation

Structure erection and PV module mounting with torque-controlled fastening, cleaning and zero-damage handling.

Module installation is a volume game that cannot compromise on care. Our crews handle unloading, storage, structure erection, module mounting, torque-controlled fastening and earthing continuity — with breakage tracked per lot.

GCC has erected PV modules and fixed-tilt MMS for the 296 MW NTPC Solar Power Project at Fatehgarh, and modules with tracker MMS for the 300 MW Cluster 2B project at Keraliya.

How we execute it

01

Unloading & Storage

Module unloading with forklifts, damage inspection and lot-wise stacking.

02

Structure Erection

MMS purlins and rafters erected and aligned to tolerance.

03

Module Mounting

Torque-controlled clamping, earthing continuity, breakage log per lot.

04

Cleaning & Handover

Row cleaning, punch-list closure and joint measurement sheet.